Create a like-for-like cohort
Compare 60 baseline and 60 candidate cells at the same 25 °C and 50% SOC in this example.
Prove production readiness beyond the specification sheet.
IndustrialMind Battery Analytics Workspace
A candidate cell lot meets the incoming specification. The NPI team must decide whether it can enter the next pilot build. Matching a specification does not establish equivalent behavior.
Build comparable evidence, explain distribution differences and define the validation gate for the candidate lot.
What evidence is still missing before we release this cell?
Use traceable records, comparable conditions and governing versions.
Decision owner: NPI engineer and validation lead.
Accepted cell tests and the governing specification
New cell measurements, supplier and batch identifiers
Method, station, temperature and state of charge
Compare 60 baseline and 60 candidate cells at the same 25 °C and 50% SOC in this example.
Review the full DCIR distribution rather than a single pass/fail result.
Repeat across lots and assess the shift under the intended load and thermal conditions.
Baseline, candidate, exclusions and method versions
Tests and acceptance criteria agreed by the validation lead
A reviewed decision for the defined lot and use
Based on the original Tesla Battery Lifecycle Intelligence Platform proposal, actual slide(s) 7, 8. This webpage expands that module into an illustrative use case. Examples, data and proposed outcomes are not verified Tesla customer results. Integrations, models and deployment scope require project-specific evaluation.
Start with one problem, the available evidence and a named engineering owner.